Join fellow Tigers for an insiders tour of the new Hollywood Burbank Airport Replacement Passenger Terminal
Join the Princeton Club of Southern California and Project Manager Janice Lee '09 who will host a small tour (limited to 10 20 total visitors) of the new Hollywood Burbank Airport Replacement Passenger Terminal
Slated to open in October 2026, the new 355,000 square-foot terminal will replace the existing terminal to meet FAA standards and State building requirements, while improving the overall passenger experience. The new terminal will offer a variety of options for shopping and dining, upgraded restrooms, and more space to move about. A new ticketing lobby, baggage screening system, updated TSA checkpoint and new baggage claim area will make traveling easier.
ELEVATEBUR.COM has information on the project if you would like to learn more about it beforehand.
For the PCSC tour:
There will be a lot of activity onsite since this is an active construction site, so we have the following requirements for site visitors:
- No mobility issues (no ADA accommodations)
- Sign a waiver
- Visitors will need to wear/bring their own work boots, construction boots, sturdy boots or hiking boots
- Long pants, at least 4" sleeves (no tank tops)
- PPE (hardhats, vests, and safety glasses will be provided.)
Meeting location and address provided upon RSVP
***if RSVPs sold out, email the event organizer ([email protected]) to get on the waiting list.
Hope to see you for this unique and timely event!
If you cannot attend Friday, the public is invited to an "Integrated Trial" September 19. We got the "hot off the press" link HERE
Covid Considerations: Note that both vaccinated and unvaccinated people may be present; everyone is encouraged to keep their distance and respect each other’s need to do so. Masks are optional. Please do not attend if you are ill or have reason to think you might have Covid.



